Tuesday, February 14, 2012

Selections Recap

We expect to have our pre-construction meeting within the next few weeks and break ground shortly thereafter.  Our paperwork states June 1st for closing, so I'll use that date for the countdown, unless we hear otherwise.  Since we've had a long wait (we signed in September), so I thought it would be nice to review our selections/upgrades.  Changes/updates since signing are noted below in red.


Floorplan:  Oakmont 
http://www.ryanhomes.com/find-your-home/our-communities/pennsylvania/ohio-township/cobblestone/oakmont



Exterior
Elevation E
Brick Front
Partial Porch

Elevation E w/ Brick Front & Partial Porch (not our color selections)

Garage
Floor Drain
2 GFI outlets

Basement
Egress Window (req'd by code)
2 Foundation Windows
3 Piece Plumbing Rough-In
Humidifier
1 GFI outlet

Main Level
Morning Room
Gourmet Island
Wyoming Cherry Spice Cabinets
Laminate Countertop - Butterum Granite
Brushed Nickel Hardware
Recessed Lighting in Kitchen
1 Additional Recessed Light above Gourmet Island
Icemaker RI  (Included in base price)
Gas Range Hook-up
4 Foot Extension to Family Room
Side Fireplace (Slate) with 2 recessed lights
Window in Family Room (rear)
1 110v Outlet in Family Room
Laundry Tub
Study
Interior Cased Openings
Crown Moulding & Chair Rail
Vinyl Flooring (Foyer, Powder Room, Kitchen, Morning Room, Laundry) - Initiator 66178
Carpet (Family Room) - Rockport with 6# pad upgrade
Carpet (Dining Room, Study) - White Fox with standard pad
Pine Banisters - Chestnut Stain

Carpet, Vinyl, Cabinet, and Countertop Samples


Upper Level
Closed Foyer
Luxury Owners Suite
Ceramic Tile Upgrade – Owners Bath - Brixton Bone w/listello
Andover Maple Spice Cabinets – Owners & Secondary Bath
Wyoming Cherry Spice Cabinets - Owners & Secondary Bath
Brushed nickel hardware (bathroom cabinets)
Double Bowl Sink in Secondary Bath
Vinyl (Secondary Bath) - Initiator 66180
Carpet (Zone 2) - White Fox with standard pad

Electrical
Dedicated Circuit (for basement level refrigerator/freezer)
6 Ceiling Fan Rough-Ins (4 bedrooms, family room, morning room)
Floodlights (rear of home)

Guardian
3 Additional Cable/Internet Connections (for bedrooms)
Base Home Security Package
1 Additional Window Contact
1 Additional Keypad

Exterior Color Selections
Brick - Biscay
Siding - Stone Mountain Clay
Shutters - Black Watch Green
Door - Fine Wine

Biscay Brick (Our shutters and door will be deeper shades of green and red.)

The next item on my to-do list is to make a list of some things I want to clarify/address at our pre-construction meeting.  Hopefully, I will be updating you with that list and a start date soon!

4 comments:

  1. Looking and sounding good! Im starting to regret not getting the garage drain. RavennaRant had a few good ideas for additional switches you might want to think about like an inside garage light switch and a master closet light switch in the master bath after move in.

    ReplyDelete
  2. I love your floor plan. They don't offer this model in our area. Can't wait to watch your progress!

    ReplyDelete
  3. Love all of your selections! I believe we chose some of the same flooring options. Can't wait for you to break ground!

    ReplyDelete
  4. Steve has a great point about the inside garage light switch. I wish I had one. It's an easy fix, but not one I will mess with anytime soon.

    ReplyDelete